
The tile job in the bathroom at the rental is finally finished. I just have to go back to do one final cleaning, make sure the oven works, do a few little touch up things. The front yard needs to be raked and the front porch floor has peeled! Anyway, the tile job wouldn't have taken all that long, but I just can't keep at it like I used to. My back is my excuse....plus I was trying to get my sock project finished....which I did that too. Here's the sock. There are two; I could only hold one above my head at a time for the photo.
It was hard to get a nice photo of the sock with a foot in it. Next time I will do the pictures flat on a table.I'm already thinking about my next project. I have a huge stash of yarn in my closet. I'm going through it tonight to figure out my next project. I pull out the yarn, and then search for the yarn type on Ravelry to see what everybody is making with theirs.
And yes, I will install the faux tile in the blue fireplace. It only needs the gloss clearcoat now.

No comments:
Post a Comment